Production rates
How fast your crews work. Your own rates always win over the crux defaults.
Settings > Production rates says how fast your crews work: units per labor hour for one worker, for each kind of work. The columns use your trade pack's words (a painter sees surface, method and coat; a general contractor sees item, task and step). crux comes with default rates built from freely published sources, each one cited. Every crux default is budget-grade until you confirm your crew's rate for it. Your own rates always win over the defaults.
Use your own rate for a default
- Under crux default rates, type what you are looking for (the search box suggests words from your trade pack) and click Find.
- On the line you want, click Use my own rate. The box opens right under that line.
- Type your crew's rate: units per labor hour, one worker, for the step the line names (the prompt uses your pack's word, such as per coat or per step). Click Check, review, and save. crux says Saved. Your rate now wins over the crux default.
Each line's Grade says how firm it is. Budget-grade is a crux default you have not confirmed: published is a rate printed in a public source, derived is one crux worked out from a source (the Source column names the basis). Your rate is one you confirmed, with the day you confirmed it; click Change my rate to replace it.
Delete your rate to go back: Deleted. The crux default applies again.
Use only my rates
Turn on Use only my rates under crux default rates if you do not want crux to use its defaults at all. It is off until you turn it on. While it is on, crux never prices a line with a default rate: when you have no rate for a task, crux says so and asks you for your crew's rate. Your own saved rates are not affected. Turn it off to get the defaults back.
Your production rates
Your saved rates are listed under Your production rates. Search them by your pack's words (for example surface and method, or item and task) or by job.
- Upload a file… or Import a folder… to add many at once. You can fill in Job these rates came from (optional); it is used for rows that do not name their own job.
- Save an example template to my Desktop gives you a blank sheet to fill in.
- Edit with crux opens a chat where you can say, for example, "my crew does 650 SF/hr on walls". You see every change before anything is saved.
A rate can be for a quantity range, for example a slower rate on small areas. Once any of your saved rates has a range, your lists show a Quantity column.
Labor rules
Labor rules are company rules that change labor hours on a whole job or task. crux adds each one to the estimate as its own line, cited to your rule. There are three kinds:
- Small-job rule: multiplies the labor hours of work under a size you set.
- Minimum-visit rule: sets the fewest labor hours a task can take. That is the number of visits times the labor hours of each visit.
- Site access rule: the time each worker loses per trip to badging and escort. crux adds it only on a job you say is a secured site.
Each rule shows what it covers, when it applies, what it does to labor hours, where it came from and when you confirmed it. To add or change a rule, tell crux in a chat or click Edit with crux. crux shows you the rule and saves it only when you say OK. Delete removes a rule, and crux says Deleted. crux no longer applies this rule.
How crux uses them
When crux prices a takeoff, it proposes a production rate for every line and shows the factors for height, lifts and occupancy separately. Where it used a crux default instead of your own rate, the estimate marks that line budget-grade and says where the rate came from.