Records and win/loss

With the company database set up, crux's bid log (win/loss) and quote records are kept in it, shared by everyone on your team.

crux keeps two records of its own: the bid log (what you bid and how it came out) and the quotes it reads. With the GC pack and a company database set up (any of the three choices), both are read from and written to that database, not to a separate list on this computer. Everyone connected to it sees the same records, and Intelligence shows them.

Not set up yet: crux keeps them on this computer, as it does for a trade pack (see Record wins and losses).

Examples use invented project names, dates, vendors and amounts.

Win/loss and bid history

Tell crux in the job's chat, in plain words:

  • "We bid the clinic at 4.32 million, due 5/12."
  • "Mark it lost, awarded to Rival A at 3.6 million." / "We got the award."

A bid is the project's row in the database: job, owner, bid date, our number, the outcome and the low or winning number; the scope, source, rank and who recorded it go in its notes. Bid openings already in the database (from the bid tabs crux recorded) show in the bid log too.

A result change is always shown first. crux answers with the one change it will make, for example "Clinic, bid event 5/12: result No award recorded → Lost (awarded to Rival A at $3,600,000)", and writes it on your yes. When several jobs match, it lists them and asks which; it never picks one itself. When your message already asked for exactly that change, it writes it at once. Afterwards it reads the result back ("Intelligence now shows Lost for ...").

The 90-day win rate and the matchup use these results.

Tip: A second copy of a project (a project row with no bid opening for the same job) is offered for removal, or its quotes are moved first. Only on your yes.

Quotes

Every quote crux reads and records (in leveling, on bid day, or when you say "review this quote") goes into the database with its trade, job, line items and unit costs, its source file and date. The quote number, the date it is good until, its terms and notes stay in the job's binder. These quotes are your Cost Data (see Cost data).

The quote date is the date you choose: when you received the quote, when the sub last confirmed or extended it, or the date printed on it. Subs hold quotes for months and re-confirm them by email or phone, so tell crux the date that is true for you, with a short note if it helps (for example, "re-confirmed by email 3/2/2027"). If you give no date, crux uses the date printed on the proposal. crux reads printed dates in the usual forms, including October 13th, 2026 and 13th of October 2026.

The printed date never stops a save. When it differs from the date you chose, crux keeps both and says so in its reply and in the quote's intake log. A BID DUE TO or SUBCONTRACTOR BID DUE date on your GC bid form is your deadline, not the sub's quote date. Scanned pages still need to be read visually. Once the quote is recorded, its database ID links it to the job's leveling row and quote log.

Moving your old records in

The first time the company database is connected while crux's own lists on this computer hold entries, crux offers once to copy them in. It shows a preview first (entries for the same job and bid date already in the database are skipped), and copies only on your yes.

When the database cannot be reached

A result or a quote that cannot be written is not saved and not queued: crux says so plainly so you can record it again once the database is back. See Company database.