Onboard a GC bid
Onboard a GC bid. crux reads every trade's documents, settles the contract structure and writes the binder.
Onboarding is the first step of every GC bid. A GC bids the whole job, so crux reads every trade, not one: every spec section, drawing, addendum, bid form and owner Q&A in the job's folder. The latest addendum governs.
Start it
- Put the bid documents in one folder (subfolders are fine). See Onboard a bid for the folder itself.
- In a chat, say "onboard this bid" and give the folder, or start from the job on the Calendar.
- Within a minute crux gives you the quick facts (bid due, submit to, owner, architect) and its first question. Reading the whole set runs in the background; the Project tab shows its progress.
Your source files are read in place. Nothing is copied, moved or changed.
What crux asks you
- Single prime or multi-prime. crux reads the documents for it (MEP let as separate prime contracts, or MEP in the GC's contract) and asks you to confirm. It never assumes multi-prime from a drawing or single-prime from silence.
- Anything the documents do not settle. Questions only the owner or architect can answer become RFIs in the binder's RFI Log.
What it writes
In the job's Binder:
| Document | What it holds |
|---|---|
| Executive summary | The bid card first (bid due, submit to, bid security, addenda to acknowledge, site walk, RFI deadline), then a 12-part cited analysis: overview, contract structure, schedule, logistics, submittals, building and sitework scope, drawing guide, risks, addenda log, geotech, document control. |
| RFI Log | Every question for the owner or architect, cited, plus the code and constructability review. |
| Specialty Procurement List | The specialty items and long-lead buys the job needs, with their spec sections. |
| ITB Checklist | Every trade package to invite, and who you invited and when. |
Behind them, in the job's crux folder: the reconciled project facts, the change log (what each addendum changed), the scope checklist that scope letters and leveling both use, and the diary that lets the next chat pick up where you left off. The checklist holds one trade per competitive sub market. Signage, toilet accessories, fire extinguishers, and canopies each have their own trade, so every quote later levels only against the subs who bid the same package.
If a trade lists several markets but its items lack spec sections, the checklist check reports "items not classified". Ask crux to identify those sections before splitting the trade. Checking an existing job leaves its saved checklist unchanged. A rebuild keeps each item once in its owning trade.
The bid card is checked against the facts before onboarding counts as done, so a date an addendum moved never reaches the bid form.
After onboarding
- Not sure you want the job? Ask for a go/no-go: a fatal-flaw scan, then a 100-point scorecard against your company's own fits.
- Otherwise the usual next steps are the RFIs, general conditions, the wage regime, then scope letters.
- A new addendum: drop it in the folder and say "addendum 3 is in". crux reads it, updates the facts, the bid card, the RFI Log, the ITB Checklist and the procurement list, and tells you what changed. See Addenda.
When you win
Say "we won this job; set it up for PM." PM onboarding establishes the Notice to Proceed anchor, reads the contract obligations, and creates the Post-NTP Action Plan and Submittal Register. After the audit it saves a durable run receipt, so won-job setup can tell this step ran. An unknown or disputed anchor stays clearly marked: a completed onboarding run does not make those dates confirmed. Rerun PM onboarding when a post-award modification changes the obligations.